| Rule Ref' | Requirement | Pure Power Racing | Variante |
|---|---|---|---|
| 3,1 | Internal parts are contained within bodywork? | No -engine intake exposed | Yes |
| 5.1.1 | Heat Exchangers modelled correctly? | Yes | Monitoring surface shape doesn't match heat exchanger shape |
Scrutineering MVRC Japan 2020
Posted in MVRC 2020, Scrutineering.